Data Centre Construction Fire Safety Solutions
Protecting mission-critical projects from construction to commissioning.
Data centre construction demands fire protection that keeps pace with tight schedules, multiple contractors and constantly changing work areas. From the first stages of the build through to fit-out and commissioning, teams need a connected way to detect fire, raise the alarm and coordinate evacuation. WES provides temporary wireless fire detection and evacuation, combining manual call points with smoke and heat detectors. Quick and simple to install, it requires no cabling or mains power.
As the build progresses, devices can be added or repositioned to cover new construction zones, enclosed rooms and equipment installation areas in line with your fire risk assessment. REACT keeps registered personnel informed through mobile app notifications in the event of an alarm activation, whether they’re on or off site.
BENEFITS
Built for the Demands of Data Centre Construction Projects
copy copy copy
Early Fire Detection
Identify potential fire incidents with automatic detection, supporting earlier intervention and reducing the risk of escalation.
Scalable Protection
Expand or reposition wireless devices as construction progresses, without extensive cabling or infrastructure changes.
Site-Wide Evacuation
Support coordinated evacuation procedures across large construction sites, multiple work zones and contractor teams.
Remote Monitoring
Maintain visibility of fire and safety events remotely, helping teams stay informed and coordinate an effective response.
Minimal Disruption
Deploy and adapt wireless protection quickly, with minimal interference to ongoing construction activities.
Protect Project Delivery
Strengthen site safety measures and help reduce the risk of incidents that could affect critical construction milestones.
SOLUTIONS
Protecting Data Centres During Construction and Commissioning
Electrical systems may be energised and high-value equipment installed before permanent fire protection is operational.
Hot work, temporary power, combustible materials and multiple contractors create changing fire risks throughout data centre construction. WES provides wireless fire detection and evacuation, combining manual call points with smoke and heat detectors to protect workers and critical infrastructure. Quick to install without cabling or mains power, the system adapts as work progresses. Connected with REACT, registered personnel receive mobile app notifications in the event of an activation or alarm, supporting response and coordination on and off site.
Wireless Evacuation System
Fast, reliable evacuations for high-risk environments.
Wireless Temporary Fire Alarm
Automatic fire detection for safety and compliance.
Emergency Notification System
Alerts for response and protection.
Water Leak Detection System
Automatic leak detection with alerts for fast action.
INSIGHTS
Data Centre Construction in Numbers
Data centre teams need a fire safety plan that can adapt as the site moves through fit-out, energisation and commissioning. These figures show the time and investment involved in a typical build, and how often schedules change.
18Months
A 50 MW data centre takes an average of 18 months to build worldwide. Temporary fire detection and evacuation coverage can adapt as work areas open and escape routes change. Source
US$10.7M
In 2025, a 50 MW data centre cost an average of US$10.7 million per megawatt to build. That’s around US$535 million for the shell and core alone, Source
57%
In 2025, 57% of data centre projects faced construction delays of at least three months. If permanent fire alarm commissioning slips, temporary coverage may need to stay in place longer. Source
FAQ
Frequently Asked Questions
Find answers to the most common questions about Ramtech’s REACT and WES wireless emergency systems. Learn about features, compatibility, installation and how these innovative safety solutions can protect your site.
Data centre construction presents significant fire risks from hot works, temporary electrical installations and complex MEP activities. Before permanent fire protection systems become operational, temporary solutions such as Ramtech’s WES wireless fire alarm system provide fire detection and evacuation capabilities, helping contractors protect workers, safeguard high-value infrastructure and reduce the risk of costly project disruption.
Wireless fire alarm systems provide flexible, scalable fire detection and evacuation without extensive cabling. Solutions such as Ramtech’s WES can be installed, expanded and repositioned as construction progresses, supporting protection across changing work zones while minimising disruption to ongoing activities.
Wireless fire detection systems can connect to remote monitoring and emergency notification platforms. Ramtech’s REACT platform works alongside WES to provide remote visibility of fire and safety events, helping designated personnel stay informed, identify affected areas and coordinate an appropriate emergency response.
Yes. Wireless fire detection systems can be configured to protect large-scale and hyperscale data centre construction projects, including multiple buildings, floors and work zones. Ramtech’s WES provides scalable wireless fire detection and evacuation, while REACT supports remote monitoring and emergency event notifications. Coverage depends on site-specific system design and requirements.
Contractors can reduce fire risks through effective hot work controls, regular inspections, temporary fire detection, clear evacuation procedures and remote monitoring. Ramtech’s WES and REACT solutions support these measures, helping protect personnel, safeguard critical infrastructure and reduce the risk of fire-related disruption to construction schedules.
CASE STUDIES
Our Safety Systems in Action
We are proud to have worked with a number of leading contractors across various industries, helping to provide enhanced safety solutions on projects ranging from high-rise commercial buildings and industrial facilities to infrastructure projects and large-scale institutional sites such as airports and government buildings. Our systems are suited to a wide range of applications and can be adapted to suit your specific requirements.
Tour Triangle, Paris
Ramtech and its French partner Prodomo provide temporary fire safety at…
Kirkstall Road, Leeds: Wireless Fire Detection and Evacuation System for a £119m Build-to-Rent Development
Bowmer + Kirkland is building the £119 million Kirkstall Road…
Le Mans 24 Hours
The 24 Hours of Le Mans becomes a temporary city in the weeks before the…
Gunboat La Grande-Motte
Gunboat’s production facility in La Grande-Motte, France, is a hub of…
Wimbledon All England Lawn Tennis Club
The All England Lawn Tennis Club at Wimbledon requires the highest…
Hungarian Grand Prix 2024
The 2024 Hungarian Grand Prix at the Hungaroring required a sophisticated…
Fairfield Road, Bow, London
This project involved the comprehensive cladding remediation of two…
Hudson Detroit
The delivery of Hudsons Detroit in 2025 marked a significant construction…
Sea La Vie Yas Island
Large construction projects require fire safety solutions that can adapt…
Plumstead
This case study explores the implementation of a comprehensive fire safety…